Comprehensive Mining Farm Infrastructure Calculator Hash Grid AI
This precise engineering tool covers every aspect of the technical design of a mining farm in a single flow; from electrical calculations and Electrical Panel design to air-cooling analysis and Immersion systems, Network Topology design, and generation of precise engineering diagrams — all based on the international IEC, ASHRAE and NFPA standards.
Enter Mining Farm Information
Please complete all sections carefullyFor each Miner Model in the farm, search and select the desired unit from the unit list so its power draw is filled in automatically; then enter the Device Count. Adding several different models with different quantities is supported. Note that actual power draw in operating conditions may differ from the rated value; this difference can result from overclock settings, Ambient Temperature, input voltage, and grid power quality.
Specify the number of racks and the average number of Miners installed per rack. The product of these two values must exactly equal the Total Miner Count entered in the previous section. This information is used to calculate PDU Layout, per-row power distribution capacity, cable routing design, the Cooling system, and Network Topology.
This section is used to precisely calculate all Electrical Panel Equipment for the miners. Diversity Factor accounts for the probability that not all Miners are on at the same instant — in mining farms this value is typically between 0.85 and 0.95. Power Factor specifies what percentage of Apparent Power (kVA) converts to active power (kW); Miners with SMPS power supplies typically have PF = of 0.90 to 0.95.
This section is used to calculate the Main Cable (Main Feeder) size, MCCB circuit breaker, and Transformer and Capacitor Bank. Voltage drop in distribution circuits is a key limiting factor — per IEC 60364-5-52, voltage drop in distribution circuits should not exceed 3%, and 5% for the total circuit.
Choosing the appropriate Cooling method is one of the most important farm design decisions. Air Cooling, with a PUE of about 1.4 to 1.8, is the most common method, while the Immersion Cooling System, with a PUE of 1.03 to 1.10, creates significant electricity cost savings.
Mining farm Network design includes precisely calculating the number of Access and Core switches, CAT6 cabling volume, and surveillance cameras. Star Topology with Collapsed Core is recommended for medium-sized farms (100 to 500 miners). Managed Switches with VLAN, LLDP capability and the IPMI protocol are essential for controlling Miners.
A Fire Suppression System is critically important for data centers and mining farms. Specific hazards of mining farms include high heat generation, extensive cabling, 24/7 unattended operation, and the risk of Miners' plastic components catching fire. Gaseous systems (FM-200, Novec 1230) are ideal for unoccupied environments. Hall Dimensions are pulled from the Cooling tab.
Engineering Calculation Sheet Hash Grid AI
Results are calculated based on the input data and IEC / ASHRAE / NFPA standards